Thermal energy transportation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11971222
APP PUB NO 20230003462A1
SERIAL NO

17901881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy transportation and grid support system utilizes at least one transportable containment module capable of storing thermal or chemical energy typically produced from renewable or geothermal sources and providing connectivity with energy conversion equipment typically located in a land or sea-based operating facility. The system includes circuitry to hookup to an adjacent electricity grid for the provision of grid support and/or piping to move thermal energy typically used to drive steam turbines generating electricity. The operating facility also includes a communication arrangement to link with and exchange operations control data with a grid or heating operator and the energy transportation operator. The invention is directed to both apparatus and method for the energy transportation and grid support system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KELVIN THERMAL ENERGY INC10 KING STREET EAST SUITE 1000 TORONTO M5C 1C3

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lynch, George W Escondido, US 3 44
Pietsch, Anton Del Mar, US 7 167
Sutherland, Stephen B Aurora, CA 14 643

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00