Edge-compressed tilting armature for a vehicle solenoid valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11971115
APP PUB NO 20230119057A1
SERIAL NO

17905376

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tilting armature for a vehicle solenoid valve, including: a ferromagnetic tilting armature for the vehicle solenoid valve which, by establishment of a magnetic field, is configured to move the tilting armature into one of two positions such that a magnetic flux, associated with the magnetic field, through the tilting armature is in the position conducted through at least one surface of the tilting armature across a gap to form a closed flux loop, wherein the tilting armature is tiltable between the two positions about an axis of rotation that is fixed with respect to the vehicle solenoid valve; in which an enlargement of the at least one surface of the tilting armature by an edge upset of the tilting armature is configured to reduce a magnetic resistance through the gap. Also described are a related vehicle solenoid valve and a related method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KNORR-BREMSE SYSTEME FUER NUTZFAHRZEUGE GMBHMOOSACHER STRASSE 80 MUENCHEN 80809

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eisenberger, Andreas Nuertingen, DE 8 8
Matar, Maher Stuttgart, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00