Bridge apparatus, systems and methods of construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11970824
APP PUB NO 20230366159A1
SERIAL NO

18353542

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Bridge systems and methods for constructing bridges having overhang surfaces employing generally rectangular, precast, prestressed concrete panels. One method includes delivering a plurality of generally rectangular, precast, prestressed concrete panels to an installation site, and delivering one or more support beams to the installation site, each support beam having a support and a base. The concrete panels are positioned on the supports of the one or more support beams with an overhang panel section and a traffic panel section. The concrete panels are then connected to the support beams by positioning steel reinforcement in block outs or voids, pouring unsolidified concrete into the voids, and curing the unsolidified concrete to form an overhang traffic surface. Bridges constructed employing the precast, prestressed concrete panels and methods. Other bridge systems employ prestressed concrete L-walls and double-T members, where weight-bearing L-walls have pockets for webs of the double-T members.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMMIT PRECAST CONCRETE LP15349 SUMMIT PARK DR SUITE 101 MONTGOMERY TX 77356

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ogorchock, John Michael Montgomery, US 4 8
Ogorchock, Michael Ryan Montgomery, US 4 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00