Hard gold alloy with zirconium, titanium and magnesium for jewelry manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11970762
APP PUB NO 20200216931A1
SERIAL NO

16623282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high purity gold alloy alloyed with at least two of the metals zirconium, titanium and magnesium for jewelry manufacture, containing 75-99.5% Gold; at least two of 0.01-1.5% Zirconium, 0.01-1.5% Magnesium, and 0.01-1.5% Titanium; 0-24.98% Copper; 0-24.98% Zinc; and 0-24.98% Silver by weight. The gold alloy has 75-260 Vickers hardness and specific gravity 14-19 g/cc. A gold alloy with zirconium, magnesium, and titanium has a rich yellow colour. A gold alloy with zirconium and magnesium has a greenish yellow colour. A gold alloy with zirconium and titanium has a whitish yellow colour. A gold alloy with magnesium and titanium has a pale yellow colour. The gold alloy shows low wear during polishing. The gold alloy includes 18-24 Caratage, suitable for jewelry manufacture due to its low specific gravity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PETHE SUBODHMUMBAI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Parab, Sharad Mumbai, IN 1 0
Pethe, Subodh Mumbai, IN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00