Railroad energy delivery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11970192
APP PUB NO 20230106707A1
SERIAL NO

17937350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein is an energy delivery system for transporting electrical energy from an electrical energy generation facility to an electrical energy consumption facility via rail. The energy delivery system can comprise a train comprising at least one rail car loaded with at least one battery system. The battery system can comprise an energy transfer interface for receiving energy from the energy generation facility when the train is located at the energy generation facility for charging batteries of the battery system and for transferring energy stored by the battery system to the energy consumption facility when the train is located at the energy consumption facility. The energy transfer interface can be configured to receive energy from a corresponding energy transfer interface mounted to a crane system of the energy generation facility and to transfer energy to a corresponding energy transfer interface mounted to a crane system of the energy consumption facility.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNTRAIN INC1540 MARKET STREET SAN FRANCISCO CA 94102

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Smith, Christopher Douglas San Francisco, US 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00