System, method, and apparatus for use in forming a composite structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11969957
SERIAL NO

16601124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for use in forming a composite structure that includes dispensing a first sheet of composite material, cutting the first sheet of composite material to form one of a plurality of plies of composite material, and providing the plurality of plies of composite material to a forming tool one at a time in a ply laydown sequence. A first sequential ply in the ply laydown sequence is provided, and then a second sequential ply in the ply laydown sequence is automatically provided after the first sequential ply has been provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 NORTH RIVERSIDE PLAZA CHICAGO IL 60606-1596

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fisher, Scott West Jordan, US 48 599
Harris, Christopher Gary Copperton, US 6 38
Henry, John R West Jordan, US 8 55
Hopkins, Andrew West Jordan, US 44 391
Troshchenovskyy, Anton West Jordan, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00