Tunnel for mounting above a road surface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11969661
APP PUB NO 20220249965A1
SERIAL NO

17621892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tunnel for mounting above a road surface (3) comprises a plurality of tunnel segments (1). Each tunnel segment is adapted for mounting at least one projector (6) therein, above a respective opening formed by the tunnel segment in a ceiling of the tunnel. The openings (5) of the plurality of tunnel segments are spaced apart in succession in a direction of travel of vehicles in the tunnel. The tunnel segments are disposed such that projection surfaces (8) of the projectors are seamlessly contiguous or overlapping on the road surface in the direction of travel. The tunnel may comprise awnings positioned at its entrance and its exit, the ceiling being formed at least in part by the awnings. A first awning (10A) may be mounted to a first tunnel segment, in the direction of travel, and a second awning (10B) may be mounted to a last tunnel segment, in the direction of travel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRP-ROTAX GMBH & CO KGROTAXSTRASSE 1 GUNSKIRCHEN A-4623

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adam, Manuel Steinhaus bei Wels, AT 1 1
Lindinger, Christopher Linz, AT 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00