Optical subassembly for non-reciprocal coupling of light and assembly process thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11966081
SERIAL NO

16928051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical subassembly for non-reciprocal coupling of light from a planar optical waveguide output outside the optical subassembly to an optical fiber includes a carrier configured to support the optical subassembly, an optical fiber fixed to the optical subassembly, a focusing optical system consisting two foci with one focus coincident with the input of optical fiber, an optical isolator to transmit light unidirectionally between two foci, an input boundary provided by the carrier to align the optical subassembly with the planar optical waveguide output. In particular, the optical subassembly is operably configured to provide a low transmission loss for light traveling from the planar optical waveguide output to the optical fiber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLOUD LIGHT TECHNOLOGY LIMITED3/F SAE TECHNOLOGY CENTRE 6 SCIENCE PARK EAST AVENUE HONG KONG SCIENCE PARK SHATIN N T HONG KONG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hung, Vincent Wai Hong Kong, HK 26 207
Mak, Wing Keung Mark Hong Kong, HK 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00