Gas-phase solvent management during production of in-situ hydrocarbons

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11965403
SERIAL NO

17352155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for producing hydrocarbons from subterranean reservoirs utilizing a production well having a plurality of fluid-inlet components spaced apart to define a plurality of production-well fluid-inlet zones. An injection fluid comprising a solvent is injected into the reservoir, resulting in a drainage fluid with a liquid phase and a gas phase occupying one or more of the production-well fluid-inflow zones. The production fluid is produced at a production-flow rate via a pump, and the gas phase:liquid phase ratio of the production fluid is modulated by orchestrating variations in the pump speed and one or more of the plurality of fluid-inlet components to prioritize hydraulic communication with a subset of the plurality of production-well fluid-inlet zones.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENOVUS ENERGY INC500 CENTRE STREET S E CALGARY AB T2P 0M5

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben-Zvi, Amos Calgary, CA 13 14
Fardi, Amin Calgary, CA 2 0
Gittins, Simon D Calgary, CA 11 107
Miller, Michael Calgary, CA 378 5972
Miller, Ryan Calgary, CA 72 584
Schrader, Trenton M Calgary, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00