Oxymethylene-copolymer manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11965058
APP PUB NO 20200362085A1
SERIAL NO

16645051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An oxymethylene-copolymer manufacturing method includes: polymerizing a polymerization raw material containing trioxane and a comonomer in the presence of an acid catalyst in a quantity that is 1.0×10−8 moles to 5.0×10−6 moles with respect to 1 mole of trioxane; adding a hydroxylamine compound represented by general formula (1) (in the formula, R1 and R2 are, independently of each other, a hydrogen atom or an organic group having 1-20 carbon atoms) to a reaction product obtained during the polymerizing of the polymerization raw material at 50-5000 times the quantity of the acid catalyst, in terms of the molar quantity, and mixing the hydroxylamine compound with the reaction product; and subjecting the mixture of the reaction product and the hydroxylamine compound, which is obtained during the adding of the hydroxylamine compound, to an additional melt-kneading.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI GAS CHEMICAL COMPANY INCTOKYO 100-8324

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okada, Takuya Mie, JP 125 582
Sunaga, Daisuke Mie, JP 25 47
Yamamoto, Yuuta Mie, JP 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00