Mobile object, information processing apparatus, information processing method, and program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11964775
APP PUB NO 20220274717A1
SERIAL NO

17632426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Proposed are a mobile object, an information processing apparatus, an information processing method, and a program that are capable of improving the accuracy of determining whether to land a drone aircraft on a landing surface. The mobile object of the present technology includes a control unit. The control unit calculates a temporal change of a landing surface from images in which the landing surface for the mobile object is imaged in time series by an imaging unit of the mobile object in a hovering state, and determines whether to land the mobile object on the landing surface on the basis of the calculated temporal change.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SONY GROUP CORPORATION1-7-1 KONAN MINATO-KU TOKYO 108-0075

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akanuma, Erio Kanagawa, JP 1 1
Maeda, Keisuke Tokyo, JP 44 629

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00