Implement attachment assembly and method of use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11964522
APP PUB NO 20220288982A1
SERIAL NO

17201701

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques and/or systems are disclosed for an implement attachment assembly for a work vehicle. The implement attachment assembly includes a member having a body extending longitudinally between a first end and a second end. The first end includes a central axis disposed at a first height relative to a member vertical axis and the second end includes a central axis disposed at a second height relative to the member vertical axis. The first end central axis is operably disposed at a different height than the second end central axis. The first end is configured to operably connect to the work vehicle. The second end is configured to operably connect to a coupling device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhosale, Digvijay A Pune, IN 4 3
Bowman, Dennis A Denver, US 11 55
Foxen, Jacob J Parkersburg, US 5 4
Heimbuch, Benjamin J Cedar Falls, US 17 46
Ubben, Grant M Parkersburg, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00