System and method for clock resynchronization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11962677
APP PUB NO 20230336325A1
SERIAL NO

17720087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of processing a data stream includes taking a first number of samples of the data stream using a sampling clock over a first observation window and storing a stored data stream including the first number of samples in a data buffer. A length of the first observation window is determined by a reference clock. A measured number of cycles of the sampling clock are determined from the first number of samples. An error between an expected number of cycles of the sampling clock and the measured number of cycles of the sampling clock in the observation window is measured. The stored data stream corresponding to the first observation window is updated to contain a second number of samples by correcting the first number of samples with the error.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS S R LITALY BRIANZA MONZA MONZA AND BRIANZA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pappalardo, Francesco Paterno', IT 55 288
Salurso, Elena Mascalucia, IT 7 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00