Method for supervisory control of building power consumption

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11962152
SERIAL NO

17255048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling power consumption includes receiving a flexibility request from an electrical utility and discovering energy relevant devices in a building. The energy relevant devices include electrical loads and alternative energy sources. Power requirements are predicted from an electrical utility for the loads, the prediction takes into account available power from the alternative power sources. Power set points are determined for the energy relevant devices based on the prediction. The power set points meet the flexibility request. The energy relevant devices are directed to operate at the power set points. A building energy management system is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARRIER CORPORATION13995 PASTEUR BLVD PALM BEACH GARDENS FL 33418

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Riverso, Stefano Cork, IE 12 2
Torchio, Marcello Cork, IE 15 2
Walker, Craig R S. Glastonbury, US 27 311

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00