Production method for all-solid-state battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11961971
APP PUB NO 20200303778A1
SERIAL NO

16756009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production method for an all-solid-state battery having a solid electrolyte layer between a positive electrode layer and a negative electrode layer, the production method including: coating or impregnating the positive electrode layer and/or the negative electrode layer with a solid electrolyte solution in which a boron hydride compound serving as the solid electrolyte has been dissolved in a solvent; and removing the solvent from the coated or impregnated solid electrolyte solution and causing the solid electrolyte to precipitate on the positive electrode layer and/or the negative electrode layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL INSTITUTE OF ADVANCED INDUSTRIAL SCIENCE AND TECHNOLOGYTOKYO 100-8921
MITSUBISHI GAS CHEMICAL COMPANY INCCHIYODA-KU TOKYO 100-8324

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Tomohiro Niigata, JP 130 1507
Katori, Aki Niigata, JP 7 10
Mukai, Takashi Osaka, JP 127 1540
Nogami, Genki Niigata, JP 13 113
Noguchi, Keita Niigata, JP 11 20
Shimada, Masahiro Niigata, JP 51 254
Yamashita, Naoto Osaka, JP 52 199
Yanagida, Masahiro Osaka, JP 26 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00