Antireflective synthetic brochosomal coatings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11959187
APP PUB NO 20210181380A1
SERIAL NO

17145749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Synthetic brochosomes can be prepared by disposing a monolayer of first polymer microspheres on a substrate and forming a layer of metal on the monolayer of the first polymer microspheres. A monolayer of second polymer microspheres is then disposed on the layer of metal to form a template. The second polymer microspheres are smaller than the first polymer microspheres. A brochosome material is then electrodeposited on the template. The brochosome material is selected from the group consisting of a metal, a metal oxide, a polymer or a hybrid thereof. The first polymer microspheres and the second polymer microspheres are then removed to form a coating of synthetic brochosomes of the brochosome material on the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE PENN STATE RESEARCH FOUNDATION304 OLD MAIN UNIVERSITY PARK PA 16802

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boschitsch, Birgitt University Park, US 11 8
Sun, Nan University Park, US 40 180
Wong, Tak-Sing University Park, US 17 22
Yang, Shikuan University Park, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00