Powered, angled-roller array delamination equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11958695
APP PUB NO 20210039895A1
SERIAL NO

16977179

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system (100) for delaminating a stream (110) of articles (A, B, C, D, E) includes a delamination unit (130) with a plurality of individually controlled rollers (134) configured to carry a stream (110) of articles (A, B, C, D, E), a detection unit (150) with a sensor (152), and a control unit (160) with a processor (162) and interfacing with the delamination unit (130) and the detection unit (150), wherein the detection unit (150) is configured to detect a position of each of the articles (A, B, C, D, E) and to transmit position data to the control unit (160), and wherein the control unit (160) is configured, through operation of the processor (162), to correlate positions of the articles (A, B, C, D, E) with the plurality of individually controlled rollers (134), and to individually control the rollers (134) based on the position data to delaminate the stream (110) of articles (A, B, C, D, E).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KÖRBER SUPPLY CHAIN LLC2700 ESTERS BLVD SUITE 200B DFW AIRPORT TX 75261

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carpenter, Michael D Arlington, US 50 313

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00