Welding control device, welding control method, and welding control program

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11958143
SERIAL NO

17040612

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A welding control device includes an actual position determination part configured to determine an actual position of the position control target on the basis of a weld characteristic amount detected from a captured image captured so as to include at least the position control target, the welding characteristic amount including at least one of a wire position of the weld wire or an electrode position of the electrode; a target position determination part configured to determine a target position being a target of the actual position corresponding to a weld condition for welding the weld target; and a position control part configured to execute a position control of the position control target to bring the actual position to the target position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hazui, Yusuke Tokyo, JP 13 9
Kamo, Kazuhiko Tokyo, JP 12 35
Kimura, Masahiro Tokyo, JP 229 2575
Nishijima, Yasushi Tokyo, JP 3 6
Sano, Yusuke Tokyo, JP 56 90
Suda, Naoki Tokyo, JP 5 6
Tateishi, Koki Tokyo, JP 28 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00