Metal assembled body

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11958136
SERIAL NO

17598085

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal assembled body including a first member formed by forging a metal material, the first member including a peripheral wall portion in which a metal flow is formed along an axial direction and an extending portion extending from the peripheral wall portion and having an opening, the peripheral wall portion and the extending portion being formed integrally, and a closing member welded to a welding surface on the extending portion to close the opening, before the closing member is welded, the extending portion being formed to expose an end portion of the metal flow at the welding surface, and a welding position of the closing member on the welding surface being set to make a width of a first region larger than a width of a region excluding the first region, the first region being a region divided by a welding site, where arrival of a gas is inhibited.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAICEL CORPORATION3-1 OFUKA-CHO KITA-KU OSAKA-SHI OSAKA 5300011 ?5300011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noda, Akifumi Tokyo, JP 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00