Seat side bolster apparatus and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11951890
APP PUB NO 20230018645A1
SERIAL NO

17863908

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Proposed are a seat side bolster apparatus and a control method thereof. The seat side bolster apparatus of the disclosure includes a driving unit, which is provided under a foam pad of a seat cushion, is moved upwards and downwards by operation of an actuator, and presses the foam pad upwards when moving upwards, and a covering bracket, which is connected to the driving unit so as to be moved upwards and downwards together with the driving unit and to which an end of a covering enveloping the foam pad of the seat cushion is fixed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI TRANSYS INCORPORATED105 SINDANG 1-RO SEONGYEON-MYEON SEOSAN-SI CHUNGCHEONGNAM-DO 31930

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jo, Sung Hyun Suwon-si, KR 127 3023
Kim, Do Hyun Yongin-si, KR 135 894
Lee, Seung Joon Hwaseong-si, KR 64 386
Lim, Jae Sang Osan-si, KR 23 62
Park, Jae Keun Hwaseong-si, KR 22 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00