Machine and method for producing a tubular product, preferably made of paper, preferably usable to produce straws

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11951707
APP PUB NO 20230241858A1
SERIAL NO

17926245

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine (10) and a method for producing a tubular product (A), preferably made of paper, which can be preferably used to produce straws starting from one or more strip-shaped elements (B), by means of winding means (17) configured in a closed loop and partly wound around a shaping member (12) on which the one or more strip-shaped elements (B) are wound in a helical manner and by means of support means (20) configured as a support belt (22) disposed in a closed loop, made of flexible material, partly wound on the shaping member (12).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
I M A INDUSTRIA MACCHINE AUTOMATICHE S P A40064 OZZANO DELL'EMILIA (BO)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Draghetti, Fiorenzo Ozzano Dell'Emilia, IT 262 1888
Misley, Federico Zanettin Ozzano Dell'Emilia, IT 1 0
Tale', Fabrizio Ozzano Dell'Emilia, IT 27 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00