Imaging assisted integrated tomography—cancer treatment method of use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11951329
APP PUB NO 20200376296A1
SERIAL NO

16996724

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method and apparatus for determining actual points along a positively charged particle beam path and/or vectors of the charged particle beam path, where the determined points and vectors aid tomographic construction of a three-dimensional image of a tumor and surrounding tissue. Further, the determined points and vectors of the positively charged particle beam are used in beam control safety, to modify a tumor treatment plan in real time, and/or in combination with co-gathered X-ray images to form a hybrid proton tomography—X-ray three-dimensional image. Preferably, common elements, such as an injector, accelerator, beam transport system, and/or patient positioning system are used for both tumor treatment and tumor imaging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BALAKIN VLADIMIRPROTVINO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balakin, Vladimir Protvino, RU 73 5555

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00