Vibration reduction of HST control lever

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11950536
SERIAL NO

17132370

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control lever of a working machine having a main operating frequency includes, a tube having a mass and a length extending from a first end to a second end. The tube defines a lumen extending from the second open end towards the first end of the tube. The control lever includes a rod having a predetermined mass and a length extending from a first end to a second end. The rod is fixed to the tube and is disposed in the lumen at a predetermined position with respect to the second end of the tube. In embodiments, the mass of the rod is determined based at least on the mass of the tube and the main operating frequency of the working machine, and the control lever has a natural frequency that is less than the main operating frequency of the working machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUBOTA CORPORATION1-2-47 SHIKITSUHIGASHI NANIWA-KU OSAKA-SHI OSAKA 556-8601

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Yuto Suwanee, US 26 222
Teraoka, Tasuku Suwanee, US 7 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00