Power converter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11949338
SERIAL NO

17652162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converter includes a positive busbar electrically connected to a positive terminal and the first capacitor electrode, and includes a negative busbar electrically connected to a negative terminal and the second capacitor electrode. The power converter includes output busbars each electrically connected to a given output terminal among multiple output terminals, a given high-side switching element among a plurality of high-side switching elements, and a given low-side switching element among a plurality of low-side switching elements. The power converter includes a cooler that cools the high-side switching elements and the low-side switching elements. The power converter includes a housing that accommodates a supply tube and a discharge tube. The positive terminal, the negative terminal, the output terminals, the inlet port, and the outlet port are exposed on the housing. The inlet port, the outlet port, the supply tube, and the discharge tube are separate members from the housing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI ELECTRIC CO LTD1-1 TANABESHINDEN KAWASAKI-KU KAWASAKI-SHI KANAGAWA 210-9530

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ajima, Masaaki Tokyo, JP 5 2
Hori, Motohito Nagano, JP 39 148
Iwasaki, Masamichi Tokyo, JP 8 68
Ohguri, Nobuaki Tokyo, JP 7 7
Sato, Ikuya Kanagawa, JP 12 56
Suzuki, Yuji Tokyo, JP 379 3700
Tanaka, Yasuhito Kanagawa, JP 64 313
Toba, Akio Tokyo, JP 27 127

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00