Method for making spatio-temporal combined optimal scheduling strategy of mobile energy storage (MES) system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11949234
SERIAL NO

17525862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making a spatio-temporal combined optimal scheduling strategy of a mobile energy storage (MES) system includes: inputting data of a power system, a traffic system, and an MES system; setting a time interval, and initializing a time interval counter; inputting real-time fault, traffic, and MES data; and performing rolling optimization and solving, and delivering regulation decision instructions of the MES system, till a fault is removed. The core of the present disclosure is to propose a spatio-temporal combined optimal model of the MES system to describe spatio-temporal coupling statuses of an energy storage vehicle, a traffic network, and a power distribution network. The present disclosure provides guidance for an optimal scheduling decision of the MES system by properly regulating a traveling path and charging and discharging power of the MES system, thereby supporting high-reliability operation of the power distribution network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STATE GRID CORPORATION OF CHINA100032 WEST CHANG'AN AVENUE XICHENG DISTRICT XICHENG DISTRICT BEIJING BEIJING CITY BEIJING CITY 100032
STATE GRID TIANJIN ELECTRIC POWER COMPANYNO 39 WUJING ROAD HEBEI DISTRICT TIANJIN 300010
ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER COMPANYNO 8 HAI TAI HUA KE 4TH ROAD HUAYUAN INDUSTRIAL DISTRICT BINHAI NEW AREA TIANJIN 300450 300450

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ding, Yi Tianjin, CN 333 2067
Huo, Xianxu Tianjin, CN 5 1
Liu, Yun Tianjin, CN 245 943
Ma, Shiqian Tianjin, CN 9 30
Wang, Tianhao Tianjin, CN 39 143
Wu, Bin Tianjin, CN 269 4282
Wu, Lei Tianjin, CN 219 4672

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00