System of critical datacenters and behind-the-meter flexible datacenters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11949232
APP PUB NO 20230178995A1
SERIAL NO

18106093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexboxes, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed at a lower cost at a flexible datacenter, the computational operation is instead routed to the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably shared a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANCIUM LLCHOUSTON TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cline,, Jr Raymond E Houston, US 52 966
Henson, David J Houston, US 27 639
McNamara, Michael T Newport Beach, US 54 984

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00