Multilayer strand steel wire rope production devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11946201
APP PUB NO 20230017733A1
SERIAL NO

17284682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer strand steel wire rope production device is provided. A pre-former is fixed on a drum, and a specific position of the pre-former is defined, a center strand payoff spool and a plurality of outer winding strand payoff spools are provided in the drum. The first wire guide mechanism is close to the corresponding outer winding strand payoff spool. One end of the outer surface of the drum away from the first wire guide mechanism is provided with a second wire guide mechanism, and a hub is additionally provided and located on one side of the drum close to the second wire guide mechanism; outer winding strands drawn from the plurality of outer winding strand payoff spools sequentially pass the first wire guide mechanism, the pre-former, and the second wire guide mechanism, and are guided to the hub for gathering to complete strand wire twisting.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGSU XINGDA STEEL TYRE CORD CO LTDNO 88 RENMIN WEST ROAD DAINAN TOWN XINGHUA TAIZHOU JIANGSU 225721

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Changxin Jiangsu, CN 6 1
Kou, Shoupeng Jiangsu, CN 1 0
Liu, Jinlan Jiangsu, CN 1 0
Liu, Xianghui Jiangsu, CN 27 36
Tian, Qingsheng Jiangsu, CN 3 4
Yao, Lili Jiangsu, CN 12 52
Zhu, Chenlu Jiangsu, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00