Calcium aluminate cement and calcium sulfoaluminate cement catalysts in gypsum panels and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11945751
SERIAL NO

17245862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Water-resistant gypsum products may be produced using a novel catalyst that includes calcium aluminate cement and/or calcium sulfoaluminate cement. For example, a water-resistant gypsum panel may have a core comprising: interwoven matrices of calcium sulfate dihydrate crystals and a silicone resin, wherein the interwoven matrices have dispersed throughout them a siloxane polymerization catalyst comprising (a) 55 wt % to 100 wt % calcium aluminate cement and/or calcium aluminate cement and (b) 0 wt % to 45 wt % and magnesium oxide, wherein the weight ratio of the siloxane polymerization catalyst to the calcium sulfate dihydrate is 0.01-5:100. The water-resistant gypsum panel may have an absence of one or more of: Portland cement, limestone, aragonite, calcite, dolomite, and slaked lime.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KNAUF GIPS KGIPHOFEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
D′anna, Nicholas Mundelein, US 1 0
Dubey, Ashish Grayslake, US 61 1638
Li, Qinghua Rolling Meadows, US 749 11147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00