Machine and method of manufacture for EIFS panels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11945062
APP PUB NO 20200189011A1
SERIAL NO

16713195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A levelling machine includes a pair of spaced apart rail assemblies, a gantry assembly and a face mill assembly. The spaced apart rail assemblies define an x axis. The gantry assembly is moveably attached to the pair of spaced apart rail assemblies whereby the gantry assembly defines a y axis. The gantry assembly is moveable in the x axis along the pair of spaced apart rail assemblies. The face mill assembly is moveably attached to the gantry assembly and is moveable in the y axis along the gantry assembly. The face mill assembly has a plurality of saw blades, the saw blades being generally in an x-y plane defined by the x axis and y axis. The saw blades have a plurality of teeth that extend downwardly generally in a z axis. The face mill assembly is moveable in the z axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVEL INTEGRATION LLC8101 MIDWAY DRIVE LITTLETON CO 80125

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vap, Travis Everett Englewood, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00