SiC wafer manufacturing method and SiC wafer manufacturing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11945049
APP PUB NO 20200391327A1
SERIAL NO

16891212

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an SiC wafer from an SiC ingot includes a verifying step of applying a test laser beam to the SiC ingot in a predetermined area with the focal point of the test laser beam set inside the SiC ingot at a predetermined depth from the end surface of the SiC ingot. The test laser beam has a transmission wavelength to SiC, thereby forming a test separation layer inside the SiC ingot at the predetermined depth. The test separation layer has a test modified portion where SiC is decomposed into Si and C and test cracks extend from the test modified portion along a c-plane in the SiC ingot. Whether or not the test cracks have been properly formed is verified. When verifying, the power of the test laser beam is changed to set a proper power at which the test cracks are properly formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DISCO CORPORATION13-11 OMORI-KITA 2-CHOME OTA-KU TOKYO 143-8580

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Torii, Shuichi Tokyo, JP 3 9
Yamamoto, Ryohei Tokyo, JP 71 304

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00