Produce harvesting apparatus and precision farming system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11944031
APP PUB NO 20210360848A1
SERIAL NO

16976488

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a precision agriculture produce harvesting system and produce harvesting apparatus configured for integration with the system, an essential feature of which is a harvesting device subsystem (100) that includes a harvesting device, for instance pruning shears (102) and a harvesting separation stroke detector (108) housed within a control module housing (110) mounted to the shears (102). A person operating the pruning shears (102) produces discernible separation strokes when the handles (104) of the shears (102) are squeezed together to produce a shearing action. The stroke detector (108) detects the separation strokes of the shears (102). By the addition of the control module (108) to the pruning shears (102), the shears are essentially converted into a data logging device by means of which important aspects of a produce harvesting process can be digitised and supplied to a harvest data digital data processing system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGRI TECHNOVATION (PTY) LTD7625 KLAPMUTS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bijker, Albert Hendrik Klapmuts, ZA 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00