Level converter and circuit arrangement comprising such level converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11942934
APP PUB NO 20230061922A1
SERIAL NO

17793764

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A level converter and circuit arrangement comprising such level converters. The level converter comprises a transistor, an impedance converter, an input voltage connection, an output voltage connection, and a power supply connection. The input voltage connection is connected to a gate terminal of the transistor. The output voltage connection is connected to a source terminal of the transistor and to the power supply connection. A first input terminal of the impedance converter is connected to the source connection or to the gate terminal of the transistor. An output terminal of the impedance converter is connected to the drain terminal of the transistor. The power supply connection is equipped to receive a current from a constant current source. The impedance converter is equipped to keep a source-drain voltage of the transistor at a predefined value using a reference voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHWERNERSTRASSE 51 STUTTGART 70469

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ritter, Rudolf Esslingen, DE 83 3432

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00