Method for precharging a network section

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11942811
SERIAL NO

17426225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is for precharging a second network section with electrical energy from a first network section of a DC network. In an initial state, an initial voltage prevailing in the second network section is lower than a DC voltage prevailing in the first network section. At a first point in time, the two network sections are connected via a resistor current path having a precharging resistor. At a subsequent second point in time, as soon as the voltage in the second network section is between the initial voltage and the DC voltage, the two network sections are connected via a semiconductor switch which is situated parallel to the resistor current path and is operated in a clocked mode or in a linear mode as a controllable resistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTWERNER-VON-SIEMENS-STRASSE 1 80333 MÜNCHEN 80333

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Handt, Karsten Berg, DE 15 46
Schierling, Hubert Erlangen, DE 58 531

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00