Transformer insulation modification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11942254
APP PUB NO 20210375524A1
SERIAL NO

17331706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A three-phase transformer including a transformer housing, a shell-form five-limb transformer core wherein main limbs include two outer main limbs and a middle main limb, three coil arrangements including two outer coil arrangements each arranged around a respective one of the outer main limbs, and a middle coil arrangement arranged around the middle main limb. The outer coil arrangements have an inter-coil insulation configured to electrically insulate the coil arrangements from the transformer housing and from the respective other ones of the coil arrangements, and wherein no inter-coil insulation is provided to the middle coil arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ENERGY LTD8050 ZÜRICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daszkiewicz, Robert Lodz, PL 3 0
Klys, Pawel Lodz, PL 10 11
Prieto, Alberto Codoba, ES 8 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00