High pressure hydrogen electrical power generator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11940183
SERIAL NO

17402776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydride heat engine produces electricity from a heat source, such as a solar heater. A plurality of metal hydride reservoirs are heated by the heating device and a working fluid comprises hydrogen is incrementally move from one metal hydride reservoir to a success metal hydride reservoir. The working fluid is passed, at a high pressure, from the last of the plurality of metal hydride reservoirs to an electro-chemical-expander. The electro-chemical-expander has an anode, a cathode, and an ionomer therebetween. The hydrogen is passed from the anode at high pressure to the cathode at lower pressure and electricity is generated. The solar heater may be a solar water heater and the hot water may heat the metal hydride reservoirs to move the hydrogen. The working fluid may move in a closed loop.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bahar, Bamdad Georgetown, US 119 1086
Fackler, Scott Harbeson, US 4 0
Golben, Peter Florida, US 3 0
Parmelee, William Dover, US 32 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00