Pipeline deployment and tie-in method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11940062
SERIAL NO

17442855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of installing a subsea pipeline for tie-in to a subsea structure includes laying, using a pipe laying vessel, an intermediate section of the pipeline on to a pipe restraint device, wherein the pipe restraint device is at or near the subsea structure, or is at or near a location at which a subsea structure will be installed, and the pipe restraint device restricts transverse movement of the pipeline. The intermediate section of the pipeline is configured to be tapped at or near the pipe restraint device for providing fluid communication between the pipeline and the subsea structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EQUINOR ENERGY AS4035 STAVANGER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sæther, Morten Lillestrøm, NO 17 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00