Fastener

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11939999
APP PUB NO 20210317861A1
SERIAL NO

17272084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fastener, in particular of a chassis component, has at least one sensor and at least one transmitter of a monitoring device for monitoring at least one mechanical fastening parameter. At least one power supply unit is associated with the transmitter, that the transmitter and the power supply unit are connected to one another by means of a switching contact, that an electrical connection can be closed by means of the switching contact, that the switching contact is designed in such a way that the electrical connection is open when the fastener is installed properly and is closed only when the fastener is released, and that the transmitter is supplied with current and transmits a signal only when the electrical connection of the switching contact is closed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WHEELGUARD GMBH27793 WILDESHAUSEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blin, Jorg Wildeshausen, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00