Rotor and rotor shaft for molten metal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11939994
APP PUB NO 20220213895A1
SERIAL NO

17703912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A molten metal rotor receives and retains an end of a molten metal rotor shaft. The rotor shaft has one or more projections at the end received in the rotor. The rotor has an inner cavity, a top surface with an opening leading to the inner cavity, and at least one abutment. The opening includes one or more portions for allowing each projection to pass through the opening and into the inner cavity. The rotor and/or shaft are then rotated so at least one of the outwardly-extending projections is under the top surface of the rotor and is against an abutment. A molten metal pump, rotary degasser scrap melter or other device used in molten metal may utilize a rotor/shaft combination as disclosed herein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOLTEN METAL EQUIPMENT INNOVATIONS LLC15510 OLD STATE ROAD MIDDLEFIELD OH 44062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Paul V Chesterland, US 150 14042

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00