Combustion-gas supply system and method thereof, device equipped with turbine engine, and fracturing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11939921
APP PUB NO 20230145963A1
SERIAL NO

17715562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion-gas supply system and a combustion-gas supply method thereof, a device equipped with a turbine engine, and a fracturing system are provided. The combustion-gas supply system includes a main pipeline and a multi-functional pipeline; the main pipeline includes a first sub-pipeline and a second sub-pipeline; the first sub-pipeline includes a first gas intake pipe, a first gas supply valve and a first gas outlet pipe arranged in sequence; the second sub-pipeline includes a combustion-gas supply valve and a gas supply pipe, the first gas outlet pipe is connected with the combustion-gas supply valve, the gas supply pipe is configured to be connected with a turbine engine, the multi-functional pipeline includes a second gas intake pipe, a second gas supply valve and a second gas outlet pipe arranged in sequence, and the second gas outlet pipe is communicated with the first gas outlet pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO LTDNO 27 JEREH ROAD LAISHAN DISTRICT YANTAI SHANDONG 264003 264003

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ji, Xiaolei Shandong, CN 74 3902
Mao, Zhuqing Shandong, CN 63 2885
Wang, Jianwei Shandong, CN 75 1840
Zhang, Peng Shandong, CN 846 8792
Zhang, Rikui Shandong, CN 100 6021

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00