Foundation with pedestal and ribs for towers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11939736
APP PUB NO 20210310262A1
SERIAL NO

17338049

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PHULY AHMED MCOON RAPIDS MN 55448

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Phuly, Ahmed M Andover, US 8 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00