Smart cam for digitalization of a gate mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11938985
APP PUB NO 20200391776A1
SERIAL NO

16437835

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A highway grade crossing gate mechanism having a smart cam system capable of measuring a parameter of the gate mechanism in real time is provided. The gate mechanism includes a DC motor, a cam system, and a controller. The DC motor is coupled to a main shaft for driving a gate arm between a vertical position and a vertical position. The cam system includes manually adjustable cams coupled to the main shaft that move contacts to open or close at some preset angular rotation in order to set operational features of a crossing gate. An internal sensing device is disposed internal to the cam system measuring a parameter of the gate mechanism in real time. A controller controls the motor and receives and stores the parameter. The parameter may be transmitted to an external network giving accurate feedback of the state of the gate mechanism in real time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY INC498 SEVENTH AVENUE 16TH FLOOR NEW YORK CITY NY 10018

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Spencer, Daniel Pittsburgh, US 19 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00