Process for preparing a soft cheesecake mixture and its production plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11937608
SERIAL NO

17558173

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a soft cheesecake mixture places the ingredients for preparing the soft mixture in a pre-mixing member. The process also includes pre-mixing the ingredients so as to blend them together to obtain a pre-mixed mixture having a density between 0.72 g/mL and 0.84 g/mL; transferring the pre-mixed mixture into a collection tank whose temperature is maintained between 25 ° C. and 40 ° C.; continuously transferring a part of the pre-mixed mixture in the collection tank towards a homogenising member; and homogenising the pre-mixed mixture by the homogenising member, whose temperature is maintained between 25° C. and 40° C. so as to obtain an emulsified mixture having a density between 0.81 g/mL and 0.92 g/mL.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TT ITALY S P A33033 CODROIPO (UD)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Turcato, Elvis Varmo, IT 1 0
Varutti, Nicola Coseano, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00