Display device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11937457
SERIAL NO

17410699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display device is provided. The display device comprises a first base substrate, a first barrier layer disposed on the first base substrate, a second base substrate disposed on the first barrier layer, a first sub-substrate disposed on the second base substrate and comprising at least one dopant selected from a group consisting of: fluorine (F), boron (B), arsenic (As), phosphorus (P), chlorine (Cl), bromine (Br), iodine (I), astatine (At), sulfur (S), selenium (Se), argon (Ar), and tellurium (Te), a second barrier layer disposed on the first sub-substrate, a second buffer layer disposed on the second barrier layer, a first buffer layer disposed on the second buffer layer, at least one transistor disposed on the first buffer layer, and an organic light-emitting diode disposed on the at least one transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG DISPLAY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Deok Hoi Seongnam-si, KR 13 29
Kim, Hun Seoul, KR 120 572
Seon, Jong Baek Yongin-si, KR 31 191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00