Control system and interrupter system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11935712
APP PUB NO 20210304974A1
SERIAL NO

17260507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system is designed to control an interrupter. The interrupter is started by a startup current to interrupt a main electric circuit. The startup current flows through an auxiliary electric circuit and has a current valve equal to or greater than a predetermined value. The control system includes a driving unit and a driven unit. The driving unit includes an intermediate electrical path to be connected to the main electric circuit. The driven unit is to be connected to the auxiliary electric circuit. When an abnormal current having a current value equal to or greater than a prescribed value flows through the intermediate electrical path, the driving unit uses, as a drive source for driving the driven unit, the abnormal current flowing through the intermediate electrical path. The driven unit supplies the auxiliary electric circuit with the startup current by being driven by the driving unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Yoshihisa Osaka, JP 14 51
Ito, Shun Hyogo, JP 64 174
Kanematsu, Kenji Osaka, JP 9 43
Kimoto, Shinya Osaka, JP 32 349
Kinoshita, Kazuhisa Osaka, JP 13 55
Kodama, Kazuhiro Hokkaido, JP 27 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00