Method and apparatus for creating a small pressure increase in a natural gas stream

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11933146
SERIAL NO

17469354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of raising the pressure of a natural gas stream (9) on an oil or gas producing installation (1) comprises using an existing high pressure gas stream (13) at the installation to drive the turbine (12) of a turbo-compressor unit (10). It is common on oil and gas producing installations to require the pressure of a gas stream to be increased by a small amount, e.g. to allow flare gas to be fed to the production gas train thereby avoiding flaring. This system may replace the current practice of using ejectors for this purpose since ejectors are very inefficient. However, it can be advantageous to feed the output of the turbine side (12) of the turbo-compressor (10) to an ejector which can give a small pre-boost to the low pressure natural gas (9) before it enters the compressor side (11) of the turbo-compressor (10). (FIG. 2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONOCOPHILLIPS COMPANY925 N ELDRIDGE PARKWAY LEGAL TECHNOLOGY & IP DEPT ATTN DOCKETING HOUSTON TX 77079

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rydland, Carl Jonas Tananger, NO 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00