Method and device for adding hops to a fermentation vessel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11932834
APP PUB NO 20200354657A1
SERIAL NO

16861517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Assembly for regulating flow of hops into a fermentation vessel includes a hollow cross-shaped connector including a first cylindrical housing intersecting a second cylindrical housing at an approximate right angle. A rotary shaft coaxially mounted within the first cylindrical housing supports a hub and uniformly spaced vanes at a proximal end with outer ends of each vane adapted to sweep in close engagement with an inner wall of the first cylindrical housing. An actuator coupled to a distal end of the shaft is configured to control rotation of the shaft to control flow of hops from a hopper configured for holding hops into a hatch of a fermentation vessel configured for holding fermenting fluid. An outlet of the second cylindrical housing sealably connects to the hatch of the fermentation vessel, and an inlet of the second cylindrical housing sealably connects to an aperture of the hopper.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAD MOLE BREWING LLC115 N 3RD STREET SUITE 301 WILMINGTON NC 28401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pederson, Ole Arthur Wilmington, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00