Laminated films and methods of making and using same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11931931
SERIAL NO

17292851

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An article comprises a laminate with a layer comprising a first latex composition containing a cross-linker component selected from sulfur, organic peroxide, vulcanizing activators, and vulcanizing accelerator; and a second layer comprising a second latex composition free of the cross-linker component. The laminate is formed by dipping a mold into the first latex composition then into the second latex composition forming a laminated film, then curing the laminated film by heating to a temperature between 90° C. to 140° C. Lastly, the laminated film is removed from the mold via inversion such that the second layer is inwards and the first layer is outwards.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARIFLEX PTE LTD6 SHENTON WAY #25-11 OUE DOWNTOWN SINGAPORE 068809

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Jong Wouter Amsterdam, NL 14 60
Henderson, Philippe Mont St. Guibert, BE 3 0
Van, Dijk Nico Amsterdam, NL 4 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00