Module for operational control of the guided advance/withdrawal device of the needle added to the smart substance injection device on board equipment for inoculating substances inside a fertile egg and smart method for injection inside a fertile egg

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11930792
APP PUB NO 20210368744A1
SERIAL NO

16760143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Module for operational control of the guided advance/withdrawal device of the needle added to the smart substance injection device on board equipment for inoculating substances inside a fertile egg and smart method for injection inside a fertile egg, wherein the “inoculation of substances” inside a fertile egg, be this into the embryo, in the case of vaccines, and even into the amniotic fluid, in the case of a nutrient or nutritional vaccine complex, allows the injection needle (11) to be brought close at a controlled speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PAS REFORM B VBOVENDORPSSTRAAT 11 CH ZEDDAM 7038

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Assuncao, Hernani Telles Santa Barbara d'Oeste, BR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00