Building load modification responsive to utility grid events using robotic process automation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11929616
APP PUB NO 20230275433A1
SERIAL NO

18312108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Responding to grid events is provided. The system determines, based on an event, to modify an electrical load of a site. The system selects a parameter for the site to adjust to modify the electrical load. The system identifies a script constructed from previously processed interactions between a human-machine interface of the building management system to adjust the parameter for the site. The system establishes a communication session with a remote access agent executed by a computing device of the site to invoke the building management system of the site. The system generates a sequence of commands defined by the script to adjust the one or more parameters for the site. The system transmits the sequence of commands to cause the remote access agent to execute the sequence of commands on the human-machine interface of the building management system to modify the electrical load of the site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PEAK POWER INC214 KING ST WEST SUITE 210 TORONTO M5V 1M1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sen, Hu Benson Pei Markham, CA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00