Control system and method for robotic motion planning and control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11927969
APP PUB NO 20200348686A1
SERIAL NO

16934046

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a robotic vehicle having a propulsion and a manipulator configured to perform designated tasks. The system also including a local controller disposed onboard the robotic vehicle and configured to receive input signals from an off-board controller. Responsive to receiving an input signal for moving in an autonomous mode, the local controller is configured to move the robotic vehicle toward one of the different final destinations by autonomously and iteratively determining a series of waypoints until the robotic vehicle has reached the one final destination. For each iteration, the local controller is configured to determine a next waypoint between a current location of the robotic vehicle and the final destination, determine movement limitations of the robotic vehicle, and generate control signals in accordance with the movement limitations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TRANSPORTATION IP HOLDINGS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baloch, Ghulam Ali Niskayuna, US 18 175
Kannan, Balajee Niskayuna, US 32 393
Tan, Huan Niskayuna, US 120 857
Theurer, Charles Alplaus, US 28 377

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00